ABSTRACT
We are designing concrete slabs-on-ground for a new steel foundry. Inside the building, slab panels will be 25 x 25 ft (7.6 x 7.6 m) in plan. Panels will be placed separately and each will have a perimeter grade beam turn-down. The panels will be doweled between each other and into a 10 ft (3 m) wide band at the perimeter of the building. At the building entrances and at some inside locations, the panels will be subject to forklift and semitruck loads. Where can I find a procedure for designing dowels (size, length, and spacing) for shear transfer between slab sections? I canít find anything in ACI 318 that relates to the development length of dowel rods subject to shear.
Subscribers: View full article in PDF format
An electronic (PDF) version is available for purchase and download. Click on the Order Now button to continue with the download.
top order now



Advertising|Copyright|Privacy Policy|Home